BFO 2.0 Meeting: Difference between revisions

From NCOR Wiki
Jump to navigationJump to search
mNo edit summary
No edit summary
Line 2: Line 2:
*Date: July 10, 2013
*Date: July 10, 2013


*Participants (planned)
See the [https://docs.google.com/document/d/1Yp8vrO-lHf_vieryKFSQQxi_E7cN2IvMw2_-0KgTaO0/edit google doc]
Present: Stefan Schulz, Alan Ruttenberg, Barry Smith, Melanie Courtot, James Overton, Yongqun (Oliver) He, James Overton, Andrew James,
Dial-in: Jie Zheng, Philippe Rocca-Serra.


'''Schedule'''
'''Schedule'''

Revision as of 13:27, 11 July 2013

  • Location: Montreal, site of ICBO
  • Date: July 10, 2013

See the google doc

Schedule

  • Session 1: 2pm - 3:30 pm
    • Use cases
Jie Zheng, Islet Cells
Oliver He, Process Patterns; BFO Software issues
    • Release process (Alan Ruttenberg, 10 min)
    • Interconnections
    • BFO specification (Barry, 10 min)
    • BFO-FOL (Barry Smith, 10 min)
  • Coffee Break
  • Session 2: 4:00 - 5:30
    • Time-related issues
    • Temporalized relations (Alan, 45 min)
    • Temporally qualified continuants (Stefan, 45 min)